Before the project can move forward, it must first take a few steps back. The deconstruction of the Memorial Bridge is underway, and the central lift span will be floated out on Monday evening next week. I was amazed when I stopped to take a photo of the light at the top of the abutment, when all of a sudden, I saw some sparks go flying down the length of the bridge.